Before the Atlantic Crossing, there was Valencia (Part 1: Arrival)

After a lot of research, in March of 2021, we signed a contract for a Vision 444 (Hull #4) already working its way through the production line in South Africa. We had the option to “get in line” and put a contract down on a future Vision hull that we could fully spec out, but […]

Before the Atlantic Crossing, there was Valencia (Part 1: Arrival) Read More »